This kiln has a new home in Edinburgh, it was made to fit through a tight gap but was left fully installed, demonstrated and ready to fire. As we were installing, the shed was being built around it. Photos below show the kiln in progress, delivery and all set up.

The burner manifold is designed to split so that you can have a slow bisque firing with full control using just one burner or with all four burner heads.

83747396 2676106692465293 7960054986384080896 O

Edinburgh Gas Kiln Installation